Welcome!

By registering with us, you'll be able to discuss, share and private message with other members of CityRP.

SignUp Now!

i008 - 4/23/2026

Methedex

Member
Parliament Speaker
Methedex
Methedex
Citizen
Joined
Sep 14, 2024
Messages
131
Inspection Report

Property:
i008
Date: 4/23/2026
Owner: DeathFired
Inspector: Methedex

Current Crimes

None
Total Score: 0
Power Source Score: 0
Power Efficiency Score: 0
Pollution Score: 0

Result: Failed

Offenses Committed
- Failure to Monitor 1st Offense
- Failed Inspection 1st Offense

Notes: No public power pylon was found nor was a public production monitor found.

This report is not completed nor is its final determination complete until signed off by the MUD minister by leaving a comment below indicated it is complete.
Inspection Scoring Details
 
I sign this report, the result above represents the final determination of this inspection. This report is now complete.
 
In accordance with the IRA, the property is scheduled for a follow-up inspection. The next inspection is scheduled in for 4/27/2026
3.a.ii If a property fails inspection, a follow-up inspection must be scheduled within 3–7 days.
 
Back
Top