- Joined
- Sep 14, 2024
- Messages
- 52
- Thread Author
- #1
In accordance with the Industrial Regulation Act this, this post provides a way to know when industrial inspections are to take place.
The enactment clause of the IRA is what is causing these inspections to take place within the next 6 days.
This table contains all scheduled inspections and their current scheduled inspection date
Since this is the first inspection for properties make sure to have a Power Pylon & Production Monitor placed in a public area for your property. This could literally be in a wall, in an enclosed room etc. You must use /mt public true, while looking at them so that anyone may access the monitor. This is how inspectors are allowed to read data from them. This will ensure you don't get the Failure to Monitor fine. If you have tenants you are responsible for them!
(d) Failure to Monitor
(1) This crime is committed when a property does not have a public production monitor & a public power pylon on every grid within the property for a inspector to use for an inspection.
It is advised to either make your property as open as possible or to allow specific access for your inspector to the property. You can if possible be present on the property and open doors and what not for the inspector to do their inspection as well.
You can refuse entry to your property. This will result in a failed inspection though in accordance with the IRA.
Feel free to do your own mock inspection to see what your score would be.
Please make sure to reply to this post with the following information.
Do NOT include the question, ONLY include your answer.
----------------------------------------------------------------------------------------------
1. Will you be present during the inspection?
2. Do you give the inspector permission to enter the property?
3. Do you need to reschedule your inspection date? If so what date(s) would you like? (Range is 4/21/2026 - 4/27/2026)
4. Do you give us permission to enter the property? If you don't reply to this, we are not permitted to enter which will result in an inspection failure.
5. Do you have any specific entry instructions or details on where the production monitor or power pylon are located? (You could have an inspector only access specific rooms if you wanted to limit access.)
----------------------------------------------------------------------------------------------
EXAMPLE REPLY
1. Yes
2. Yes
3. Yes 4/25/2025 5pm works for me!
4. Yes, with limitations.
5. You may enter via the *staff door* I have added the planned inspector to the /trust so you should be able to open the door. A power pylon and production monitor are next to this door as well.
The enactment clause of the IRA is what is causing these inspections to take place within the next 6 days.
This table contains all scheduled inspections and their current scheduled inspection date
| Property ID | Owner | Date | Inspector | Owner Present | Allowing Entry |
|---|---|---|---|---|---|
| i001 | ocg | 4/23/2026 | Pending | Pending | Pending |
| i002 | StuffTheTurkey0 | 4/23/2026 | Pending | Pending | Pending |
| i003 | Cofys | 4/23/2026 | Pending | Exempt LOA returns 6/1 | Exempt LOA returns 6/1 |
| i004 | Westray | 4/23/2026 | Pending | Pending | Pending |
| i005 | xXLordLyonXx | 4/23/2026 | Methedex | Yes, evening EST | Yes |
| i006 | RDS | 4/23/2026 | Pending | Pending | Pending |
| i007 | CityRPGov | 4/23/2026 | Exempt | Exempt | Exempt |
| i008 | DeathFired | 4/23/2026 | AgentSquid | Pending | Pending |
| i009 | W4RP4TH | 4/23/2026 | AgentSquid | Yes with reminder | Yes |
| i010 | Methedex | 4/23/2026 | AgentSquid | Yes | Yes |
| i011 | Aeronox4 | 4/23/2026 | Pending | Pending | Pending |
| i012 | Aeronox4 | 4/23/2026 | Pending | Pending | Pending |
| i013 | Aeronox4 | 4/23/2026 | Pending | Pending | Pending |
| i014 | Aeronox4 | 4/23/2026 | Pending | Pending | Pending |
| i015 | Matty707 | 4/23/2026 | W4RP4TH | Yes see reply | Yes see reply |
| i016 | Matty707 | 4/23/2026 | W4RP4TH | Yes see reply | Yes see reply |
| i017 | Matty707 | 4/23/2026 | W4RP4TH | Yes see reply | Yes see reply |
| i018 | Matty707 | 4/23/2026 | W4RP4TH | Yes see reply | Yes see reply |
| i019 | RDS | 4/23/2026 | Pending | Pending | Pending |
| i020 | UsernameDude100 | 4/23/2026 | Pending | Maybe | Yes |
| i021 | jotoho | 4/23/2026 | AgentSquid | No | Yes |
| i022 | LilDigiVert | 4/23/2026 | Pending | Pending | Pending |
| i023 | Galavance | 4/23/2026 | Pending | Pending | Pending |
| i024 | Nopuu | 4/23/2026 | Pending | Pending | Pending |
| i025 | Nanicholls | 4/23/2026 | Pending | Maybe | Yes |
| i026 | BiscuitPlaysYT | 4/23/2026 | Pending | Maybe | Yes + See Reply |
| i027 | UsernameDude100 | 4/23/2026 | Pending | Maybe | Yes |
| i028 | Corpora | 4/23/2026 | Pending | Yes, W4RP4TH will be present if reminded | Yes |
| i029 | EmeraldMXR | 4/23/2026 | Pending | Pending | Pending |
| i030 | LilDigiVert | 4/23/2026 | Pending | Pending | Pending |
| i031 | Saggwizard13 | 4/23/2026 | Pending | Pending | Pending |
Notes
Owners may request a different date if we are capable of rescheduling that reasonably.Since this is the first inspection for properties make sure to have a Power Pylon & Production Monitor placed in a public area for your property. This could literally be in a wall, in an enclosed room etc. You must use /mt public true, while looking at them so that anyone may access the monitor. This is how inspectors are allowed to read data from them. This will ensure you don't get the Failure to Monitor fine. If you have tenants you are responsible for them!
(d) Failure to Monitor
(1) This crime is committed when a property does not have a public production monitor & a public power pylon on every grid within the property for a inspector to use for an inspection.
It is advised to either make your property as open as possible or to allow specific access for your inspector to the property. You can if possible be present on the property and open doors and what not for the inspector to do their inspection as well.
You can refuse entry to your property. This will result in a failed inspection though in accordance with the IRA.
Feel free to do your own mock inspection to see what your score would be.
Please make sure to reply to this post with the following information.
Do NOT include the question, ONLY include your answer.
----------------------------------------------------------------------------------------------
1. Will you be present during the inspection?
2. Do you give the inspector permission to enter the property?
3. Do you need to reschedule your inspection date? If so what date(s) would you like? (Range is 4/21/2026 - 4/27/2026)
4. Do you give us permission to enter the property? If you don't reply to this, we are not permitted to enter which will result in an inspection failure.
5. Do you have any specific entry instructions or details on where the production monitor or power pylon are located? (You could have an inspector only access specific rooms if you wanted to limit access.)
----------------------------------------------------------------------------------------------
EXAMPLE REPLY
1. Yes
2. Yes
3. Yes 4/25/2025 5pm works for me!
4. Yes, with limitations.
5. You may enter via the *staff door* I have added the planned inspector to the /trust so you should be able to open the door. A power pylon and production monitor are next to this door as well.
Last edited: